Skip to content

Controls and control testing

Each risk records the controls that reduce it. The effectiveness of those controls is what turns inherent risk into residual risk, and control testing checks that the controls work as recorded.

Who may do it: the Risk Champion for their own team’s risks; the Entity Risk Manager for the whole entity. See Roles and permissions.

Each control on a risk carries an effectiveness assessment. The system takes the risk’s inherent score and the effectiveness of its controls and computes the residual score, tier and band. Residual risk is never higher than inherent risk. See Scoring a risk.

  1. Open the risk.
  2. Add the control and describe what it does.
  3. Assess its effectiveness.
  4. Save. The residual score updates.
  1. Plan the test. On the control, create a test plan: what will be tested, how, and when.
  2. Record the result when the test is done: passed or failed.
  3. Record the findings — what the test found.
  4. A failed test creates an action item in the action register, with an owner, a due date and a status. Findings that need follow-up also go to the action register.
  • Creates the action item for a failed test automatically; nobody has to re-key it.
  • Records who and when on every test plan, result and finding. See Who-filed is stamped.
  • Keeps the history. Earlier test results stay on the control.
  • Refuses changes from outside the entity. A parent user reads the controls and test results of a subsidiary and cannot record or change them. See Subsidiary-Independence.